Feb 192005
 

This week, the grout in the kitchen was installed, the walls in the bathroom were finished, the tub was frames, and baseboard molding was partially installed along with low-voltage wiring.

Bedroom. Note the baseboard molding.
My bedroom

The tub is covered right now so the basin isn’t damaged. I still need to buy a sink and a toilet.
My bathroom

I will not buy a washer/dryer right away. However, I have the hookups fully installed and the flooring is ready.
My bedroom

Closeup of kitchen tile with new grout.
Kitchen tile

 Posted by at 5:54 pm

Leave a Reply